IN PROGRESS
As with many things, it is not the destination but the journey that is important, and so each step from pre-construction, demolition, site work, and safety meetings is all vital to the process. Being on the same page as our clients every step of the way strengthens our TEAM effort and leaves us with not only a beautiful finished product, but a lasting relationship.
IN PROGRESS
As in many things, it is not the destination but the journey that is important, and so each step from pre-construction, demolition, site work, and safety meetings is all vital to the process. Being on the same page as our clients every step of the way strengthens our TEAM effort and leaves us with not only a beautiful finished product, but a lasting relationship.
Imagine Children’s Museum
Start Date:
Location:
Everett, WA
Total Square Feet:
35,000
Project Duration:
Project Scope:
This is one of many projects Gaffney Construction has completed for Imagine Children’s Museum over the past two decades. Including the original buildout of a former bank building, and the conversion of the parking garage into what is the lodge portion of the Museum today.
This new addition is a 35,000 SF three story building utilizing CLT (Cross Laminated Timber). The entire structure of the building was pre-fabricated in Austria, Canada, and Yakima, shipped to the site and assembled in place. When complete, this project will achieve LEED Silver certification for the sustainable design and construction and will be one of the first buildings built utilizing CLT in Snohomish County.
Stillaguamish Village
Start Date:
January 2019
Location:
Arlington, WA
Total Acres:
40
Project Duration:
2.5 years (phase I)
Project Scope:
Phase one consists of developing 40 acres of the 80-acre site. Installing the infrastructure, roads, parks, trails, and a deer meadow. Buildings will include a canoe carving workshop, 6 elders townhomes and 4 cottages, a wellness clinic, a pavilion, 5 single-family residences, and 6 youth townhomes.
Roy Robinson RV
Start Date:
July 2019
Location:
Marysville, WA
Total Square Feet:
55,000 on 14.5 acres
Estimated Completion:
Spring 2020
Project Scope:
Site development and construction of a new RV sales and service center. The building is a pre-engineered metal building with large showroom/sales area, parts & parts storage. Service writers, and waiting lounge. There are two delivery bays. The service area consists of 20 service bays, 1 wash bay, and 6 bays for body and repair with a large paint booth. The site consists of 144 paved parking stalls for RV display and customer parking.
St. Mary Magdalen Parish
Start Date:
Fall 2019
Location:
Everett, WA
Total Square Feet:
14,000
Estimated Completion:
Spring 2020
Project Scope:
Major Renovation and expansion of St. Mary Magdalen Church in Everett.
Imagine Children’s Museum
Start Date:
Location: Everett, WA
Total Square Feet: 35,000
Project Duration:
Project scope:
This is one of many projects Gaffney Construction has completed for Imagine Children’s Museum over the past two decades. Including the original buildout of a former bank building, and the conversion of the parking garage into what is the lodge portion of the Museum today.
This new addition is a 35,000 SF three story building utilizing CLT (Cross Laminated Timber). The entire structure of the building was pre-fabricated in Austria, Canada, and Yakima, shipped to the site and assembled in place. When complete, this project will achieve LEED Silver certification for the sustainable design and construction and will be one of the first buildings built utilizing CLT in Snohomish County.
Stillaguamish Village
Start Date: January 2019
Location: Arlington, WA
Total Acres: 40
Project Duration: 2.5 years (phase I)
Project scope: Phase one consists of developing 40 acres of the 80-acre site. Installing the infrastructure, roads, parks, trails, and a deer meadow. Buildings will include a canoe carving workshop, 6 elders townhomes and 4 cottages, a wellness clinic, a pavilion, 5 single-family residences, and 6 youth townhomes.
Roy Robinson RV
Start Date: July 2019
Location: Marysville, WA
Total Acres: 55,000 on 14.5 acres
Estimated Completion: Spring 2020
Project scope: Site development and construction of a new RV sales and service center. The building is a pre-engineered metal building with large showroom/sales area, parts & parts storage. Service writers, and waiting lounge. There are two delivery bays. The service area consists of 20 service bays, 1 wash bay, and 6 bays for body and repair with a large paint booth. The site consists of 144 paved parking stalls for RV display and customer parking.
St. Mary Magdalen Parish
Start Date: Fall 2019
Location: Everett, WA
Total Square Feet: 14,000
Estimated Completion: Spring 2020
Project scope: Major Renovation and expansion of St. Mary Magdalen Church in Everett.