The Gateway Building
Location:
Mill Creek, WA
Square Feet:
24,000 + 12,100 SF
below grade parking garage
Completed:
May 2013
Gaffney completed this 36,000 sf medical office building in May of 2013. Construction consists of Concrete foundations and slabs with structural steel support and a steel stud framed shell with architectural metal wall panels and CMU finishes. Steel canopies accent the building. The project also included a 60,000 cubic ft underground storm water detention vault and is the first project to be built under the design guidelines for the new East Gateway Urban Village Zone.
Location:
Mill Creek, WA
Square Feet:
24,000 + 12,100 SF
below grade parking garage
Completed:
May 2013
Gaffney completed this 36,000 sf medical office building in May of 2013. Construction consists of Concrete foundations and slabs with structural steel support and a steel stud framed shell with architectural metal wall panels and CMU finishes. Steel canopies accent the building. The project also included a 60,000 cubic ft underground storm water detention vault and is the first project to be built under the design guidelines for the new East Gateway Urban Village Zone.